Jhansi - Bina Railway Line | India
Train DetectionIndia

Jhansi - Bina Railway Line

Operator
Indian Railways – North Central Railway
Country
India
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
RSR180, FAdC
Year
2017
Scope of project
221 counting heads, 148 track sections

The Jhansi-Bina railway line is a strategically important line which belongs to North Central Railway and is in Uttar Pradesh. Initially, the line featured analogue axle counters for detecting trains in individual track sections as well as a DC track circuit train detection system in less congested areas.

Eventually, there was a requirement to get them replaced with the Frauscher Advanced Counter FAdC. This project is one of Frauscher’s iconic Indian Railway projects, featuring 221 counting heads and 148 track sections.

In this project, the FAdC indoor electronics were placed in 19 stations and 15 block huts, and all 34 are connected over an Ethernet based redundant network, in a distributed architecture.

The wheel sensors were mounted onto the rail with the patented Frauscher Rail Claw which makes the installation process easy and convenient, since no drilling is required. In turn, this preserves the structural integrity of the rail, saves costs, and reduces the dwell time on track for the installation engineers. Additionally, the distributed architecture used in this project minimises setup costs and enhances scalability in an efficient and cost-effective way.

Increasing Availability

COM redundancy, PSC redundancy & network redundancy with bus architecture for very high availability.

Easy and Cost effective Integration

Greater cost saving due to distributed architecture and lower maintenance requirement.

Similar Projects
This might also interest you
1/5
Train DetectionUnited States of America

Class 1 Grade Crossing Enhancement FAdC and RSR180

Frauscher was approached by a US Class 1 railroad regarding a grade crossing owned and operated by them, on a track crossing a public road. The operator’s main goal was to find a signaling solution that would seamlessly integrate with the current crossing controller and keep the crossing operational under challenging operational conditions. The Frauscher Advanced Counter FAdC and Wheel Sensor RSR180 were chosen as the ideal solution for this particular project.
Data TransmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
Data TransmissionIndia

South Central Railway

The Vijayawada Division of Indian Railways introduced a new train detection system with data transmission functionality to overcome the challenges of the existing BPAC and conventional quad cable-based systems. Frauscher implemented the Frauscher Advanced Counter FAdC, featuring full redundancy, advanced reset mechanisms and remote diagnostics. This upgrade delivers significant cost savings and enhanced system availability for the operator.
Train DetectionCanada

Edmonton Metro Line

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.
Train DetectionSpain

Three-rail Castellbisbal

The dual-gauge system of the Spanish railway network is quite challenging in terms of track vacancy detection: Wheel sensors must be installed on two rails next to each other in tight spaces and have to detect axles reliably on the respective rail. Frauscher developed a solution which copes also with the complexity of different interlocking technology in the stations along the line.