Chengdu Tram Line 2 | China
train-detectionChina

Chengdu Tram Line 2 | China

Operator
CHENGDU RAIL TRANSIT
Country
China
Segment
Urban
Application
Level Crossing Protection
Products
FAdC
Protocols
Proprietary protocols
Year
2018

Chengdu Tram Line, located in the capital Chengdu City of Sichuan Province, is the first tram line to be operational in the city since 2018. The overall line is Y-shaped, with a total length of 39,3 km and 47 stations. It is also the first line in China to be equipped with the new generation Frauscher Advanced Counter FAdC® that supports communication via serial protocols.

To ensure an optimal operating environment, this project uses a relay hardware interface and a customised Ethernet-based software interface in conjunction with the FAdC. The modular and scalable design of the software interface allows it to be seamlessly integrated into more complex high-level systems and interlocking systems.

With inductive sensing on the FAdC, train detection becomes more reliable and accurate. In addition, intelligent functionalities such as STS and CHC help suppress accidental induction and customise the number of suppressions. These functionalities play a pivotal role in this project because the track is built on public streets and metallic debris scattered on the track could cause interferences and affect the wheel sensors. The CHC function takes care of this by suppressing accidental fault or occupancy messages triggered by external effects. Meanwhile, STS helps operators save time as it resets faulty track sections automatically, eliminating the need for manual intervention.

The FAdC® supports integrator-specified serial protocols to implement safety-related data communication for open transmission systems. In addition, the communication board is SIL 4 certified.

Reduced maintenance costs

State-of-the-art communication technology, customised safety protocols and intelligent functionalities of the FAdC have reduced the space occupation, energy consumption and overall maintenance costs for the Chengdu line.

Smart functions for maximised availability

Intelligent functionalities such as STS and CHC suppress error messages caused by accidental interferences and enable faulty track sections to be reset automatically, ensuring failsafe functioning, and further increasing the availability of the system.

Seamless integration into higher-level systems

The software interface has a modular and scalable design, delivering a high degree of flexibility in design and enabling the FAdC to be easily configured and integrated into other systems.

Similar Projects
This might also interest you
1/5
train-detectionPoland

Metro Warsaw | Poland

Metro Warsaw was looking for an alternative to track circuits for the line M2, to increase the availability of public transport by using reliable signalling technology. In the end, the operator even decided to replace the existing track circuits on line M1 with the Frauscher Axle Counter ACS200.
train-detectionFinland

Kokkola | Finland

Frauscher supplied one of Finland’s busiest railway lines with new axle counters. The line was extended from a single to a double track section and Mipro was looking for a solution which can interface with their interlocking system in an efficient and cost effective way.
train-detectionFrance

Homologation for the Île-de-France tramway network | France

The network of Île-de-France tramways in the region of Paris has been a showcase model of public transport since the line T1 opened in 1992. Over a million passengers use these trams daily and today, the system consists of 11 lines covering over 100 kilometres of track. Over the next years it is planned to expand this network even further. For track vacancy detection, the Frauscher axle counting system is considered as being the ideal solution for this comprehensive network.
train-detectionIndia

Vijayawada – Gannavaram Rail Line | India

The Vijayawada – Gannavaram rail line belongs to South Central Railway and is situated in Andhra Pradesh. Initially, the line featured a conventional signalling system and there was a requirement by the operator to update this into an automatic signalling system with the Frauscher Advanced Counter FAdC.
train-detectionSpain

Three-rail Castellbisbal | Spain

The dual-gauge system of the Spanish railway network is quite challenging in terms of track vacancy detection: Wheel sensors must be installed on two rails next to each other in tight spaces and have to detect axles reliably on the respective rail. Frauscher developed a solution which copes also with the complexity of different interlocking technology in the stations along the line.