Shalun Signaling | Taiwan
Train DetectionTaiwan

Shalun Signaling

Operator
TRA Taiwan Railway Administration
Country
Taiwan
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
RSR180, ACS2000
Year
2009

The Shalun Line is frequented by four-car-trains and located in the south of Taiwan. Tropical conditions with temperatures between 22 and 28 degrees and high humidity are not the only challenge the Frauscher Axle Counter Solution has to deal with.

Taiwanese Railway Administration TRA is running the Shalun Line between the stations of Shalun, Chang Jung Christian University and ZhongZhou. It is located in the South of Taiwan, with challenging environmental conditions like high humidity and possible occurrences of floods, among others.

In 2009, the TRA decided to install a Frauscher Axle Counter Solution, based on the Frauscher Axle Counting System ACS2000 and Wheel Sensor RSR180, which has demonstrated maximum reliability and availability under the local requirements without a single malfunction to this day. The RSR180 handles floods and humidity with ease, as it is fully sealed according to IP68.

The robust wheel sensors are easily and quickly mounted without drilling the rail using the Frauscher rail claws. Within the established centralised architecture, no electronics had to be installed at track side, but in housings and cubicles at stations and depots, where they are protected from environmental influences.

Based on the satisfying results that have been achieved by installing this system, Frauscher successfully delivered more than 1800 detection points with the RSR180 and the ACS2000 over the years as they are 100% compliant with the TRA axle counting specifications.

Robust trackside equipment

Frauscher trackside equipment is developed to withstand harsh environments and functions entirely without any trackside electronics.

Easy mounting

The flexibility and modularity of Frauscher’s system enabled an individual, centralised design. By using the Frauscher rail claws the wheel sensors could be easily and quickly mounted without drilling the rail.

Similar Projects
This might also interest you
1/5
Train DetectionChina

Tram Huangpu Line 1

Tram Huangpu Line 1 (HP1) line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions can cause flooding of the track bed and add to the challenges for reliable system availability and operations.
Train DetectionUnited Kingdom of Great Britain and Northern Ireland

Maintaining the past, creating the future

The Dean Forest Railway (DFR) operates a historical 7 km passenger service line running north from Lydney Junction to Parkend, in the Forest of Dean. Due to extensions of the line and an additional turnout being added at Parkend, an update and modernisation of the existing train detection and signalling system was necessary. Being a heritage railway, it requires high standards in terms of signalling and safety, whilst maintaining the historical touch of the line.
Train DetectionIndia

Increasing Availability at Adra Yard

Adra Yard belongs to the Southeastern Railway Zone of Indian Railways and is in West Bengal. Initially the yard was equipped with track circuits and there was a requirement to get them replaced with the Frauscher Advanced Counter FAdC. This project is one of Frauscher’s esteemed Indian Railway Projects with a coverage of 139 counting heads and 97 track sections.
Train DetectionCanada

Toronto Transit Commission

The Toronto Transit Commission (TTC) Line 1 Yonge-University is Toronto’s longest subway line, with track circuits utilized for signalling. Due to an increasing number of daily passengers and an aged system the need for upgrading without interfering with the daily operations became readily apparent. It was further required that the new signalling system functions independently of the existing system. It would provide CBTC fallback functionalities, and work as an overlay to the current track circuit-based system.
Data TransmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.