Scope of project
approx. 760 wheel sensors

Beijing metro, one of the busiest lines in the world, was Frauscher’s very first assignment when entering the Chinese market. Due to its utilised capacity, it requires a great level of stability, reliability and performance of the entire signalling system. The Communication Based Train Control System (CBTC) applied here relies on a backup system consisting of fixed automatic train detection systems. Axle counting systems from Frauscher are perfectly suited for the accurate operation of such stand-by systems.

Frauscher axle counters have been separately integrated into the interlocking systems of the 9 lines in Beijing- Yizhuang Line, Changping Line, Beijing Line 8, etc. covering in total 226.35 km with an average daily passenger flow of 266,000. Furthermore, the axle counters had to be SIL4 certified. The ACS2000 with IMC and RSR180 was the preferred system by the three signalling operators and a total of 763 wheel sensors across 645 track sections were installed. A wide range of rail claws satisfied the multiple rail track requirements on the network, such as slab and ballasted track. Easy and fast mounting of rail claws allowed a timely and cost-efficient installation.

After over 10 years of operation, the ACS2000 has proven its outstanding stability and reliability. Furthermore, the ACS2000 has not only fulfilled all the operating requirements but has also always guaranteed a smooth operation of the metro lines.

Excellent match of requirements

The ACS2000 has fully met all the strict challenges outlined in this project as well as the operating requirements set by both the integrators and the operators.

Significant reduction of time

Easy and fast mounting of rail claws allowed the installers to greatly shorten the timescale of the entire project.

Highest flexibility

The modular design of the ACS2000 offers clients the highest flexibility in daily operation, including a simple, fast and efficient reset process which significantly reduces the Mean Time to Repair (MTTR).

Similar Projects
This might also interest you
1/5
train-detectionChina

Fenghuang Maglev | China

Fenghuang Maglev is a medium-low speed maglev rapid transit line. Since maglev trains do not have wheels, traditional wheel-based detection systems cannot be directly applied to maglev traffic engineering.
train-detection

Maintaining the past, creating the future | UK

The Dean Forest Railway (DFR) operates a historical 7 km passenger service line running north from Lydney Junction to Parkend, in the Forest of Dean. Due to extensions of the line and an additional turnout being added at Parkend, an update and modernisation of the existing train detection and signalling system was necessary. Being a heritage railway, it requires high standards in terms of signalling and safety, whilst maintaining the historical touch of the line.
train-detectionIndia

Vijayawada – Gannavaram Rail Line | India

The Vijayawada – Gannavaram rail line belongs to South Central Railway and is situated in Andhra Pradesh. Initially, the line featured a conventional signalling system and there was a requirement by the operator to update this into an automatic signalling system with the Frauscher Advanced Counter FAdC®.
train-detectionGermany

Dillinger Hütte | Germany

A new ladder track was required to provide more parking tracks in the steel plant. At the same time, the layout of the dead end tracks were optimised and the efficiency of the whole depot improved by installing the Frauscher Advanced Counter FAdC®i in combination with the wheel sensor RSR180. With the implementation of the Frauscher Diagnostic System FDS, the overall maintenance costs can be significantly reduced.
train-detectionChina

Beijing Metro Line 12 | China

The Beijing Metro Line 12 is the first metro line that combines Frauscher Advanced Counter FAdC® and Railway Signal Safety Protocol Type I (RSSP-I). The line is currently under construction and expected to be put into operation at the end of 2024.