Frauscher Sensor Technology has completed the divestiture to Wabtec Corporation.

Find Out More
Churnet Valley Heritage Railway | UK
Train DetectionUnited Kingdom of Great Britain and Northern Ireland

Churnet Valley Heritage Railway

Operator
Churnet Valley Railway PLC
Country
United Kingdom of Great Britain and Northern Ireland
Partner
Frauscher UK & Ireland
Segment
Urban
Application
Track Vacancy Detection
Products
FAdC®, RSR123
Year
2016
Scope of project
Re-signalling to depot area

The Churnet Valley Heritage Railway preserves England's rich heritage of steam-powered rail transport. As the heritage railway pursued further expansion, the operator sought to implement modern and efficient signalling solutions for track vacancy detection. By integrating cutting-edge axle counting technology in the form of the Frauscher Advanced Counter FAdC®, the operator was able to increase the safety, availability and reliability of the railway operations. This modernisation effort was part of a broader strategy to preserve the railway's historic charm while embracing contemporary advancements to meet current and future demands.

Churnet Valley Heritage Railway offers a nostalgic steam train ride through time, embracing the rich railway history of the Moorlands. Led by a team of volunteers, Churnet Valley aims to preserve steam-powered rail transport. The railway is operated and maintained by a dedicated team of volunteers who share a common passion for preserving the legacy of this historical line and their efforts ensure that the significance and charm of these vintage trains are not only maintained but also celebrated.

As Churnet Valley embarked on a journey of expansion, a need arose to explore modern, efficient solutions for their upcoming project at Leekbrook junction and Cheddleton. The Churnet Valley Heritage volunteers approached the Frauscher UK & Ireland team for solutions to meet their operational need for train detection and seamless data integration to their Programmable Logic Controller (PLC).

Seamless Integration

Multiple secure outputs from FAdC® were seamlessly integrated with the current PLC system.

Comprehensive Support

On-site assistance during set-up and follow-up communication post-commissioning.

Accommodation of Last Minute Requests

Team Frauscher accommodated last minute requests for multiple track section outputs, utilising the full modularity and flexibility of FAdC®.

Consequently, the Frauscher Advanced Counter FAdC®  alongside Frauscher Wheel Sensor RSR123 were used for the purposes of track vacancy detection, ensuring smooth, safe and efficient rail operations at all times.

The Frauscher UK & Ireland team had to mitigate unique challenges during installation. Utilising the modularity, scalability and flexibility of the FAdC®, the system was able to fulfil all the operational needs and requirements of the operator. Easy and efficient installation of the wheel sensors was ensured thanks to the patented Frauscher Railclaw which eradicated any drilling into the rail and reduced the dwell time of staff on the track.

Furthermore, our on-site assistance during set-up and follow-up communication post-commissioning ensured seamless integration of the FAdC® into larger systems, providing utmost customer satisfaction.

Similar Projects
This might also interest you
1/5
Train DetectionCanada

Edmonton Metro Line

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.
Train DetectionAustria

GKB Graz-Köflacher Bahn

The operator of the Graz-Köflach line has made substantial modernisations to the network, choosing a decentralised system architecture and the EULYNX standardised interface. In this case, it was crucial that the new system would ensure a seamless transition from the previous parallel interface for relay systems to EULYNX.
Data TransmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
Train DetectionUnited States of America

Frauscher Track Vacancy System FTVS Testing

During the initial development phase of the Frauscher Track Vacancy System FTVS, a number of pre-production units were released for real-world testing to examine their performance in typical yard environments. Consequently, several trials were conducted in the United States.
Train DetectionChina

CBTC Fallback System on Beijing Metro Lines

Beijing metro, one of the busiest lines in the world, was Frauscher’s very first assignment when entering the Chinese market. Due to its utilised capacity, it requires a great level of stability, reliability and performance of the entire signalling system. The Communication Based Train Control System (CBTC) applied here relies on a backup system consisting of fixed automatic train detection systems. Axle counting systems from Frauscher are perfectly suited for the accurate operation of such stand-by systems.