Chengdu Tram Line 2 | China
train-detectionChina

Chengdu Tram Line 2 | China

Operator
CHENGDU RAIL TRANSIT
Country
China
Segment
Urban
Application
Level Crossing Protection
Products
FAdC®
Protocols
Proprietary protocols
Year
2018

Chengdu Tram Line, located in the capital Chengdu City of Sichuan Province, is the first tram line to be operational in the city since 2018. The overall line is Y-shaped, with a total length of 39,3 km and 47 stations. It is also the first line in China to be equipped with the new generation Frauscher Advanced Counter FAdC® that supports communication via serial protocols.

To ensure an optimal operating environment, this project uses a relay hardware interface and a customised Ethernet-based software interface in conjunction with the FAdC®. The modular and scalable design of the software interface allows it to be seamlessly integrated into more complex high-level systems and interlocking systems.

With inductive sensing on the FAdC®, train detection becomes more reliable and accurate. In addition, intelligent functionalities such as STS and CHC help suppress accidental induction and customise the number of suppressions. These functionalities play a pivotal role in this project because the track is built on public streets and metallic debris scattered on the track could cause interferences and affect the wheel sensors. The CHC function takes care of this by suppressing accidental fault or occupancy messages triggered by external effects. Meanwhile, STS helps operators save time as it resets faulty track sections automatically, eliminating the need for manual intervention.

The FAdC® supports integrator-specified serial protocols to implement safety-related data communication for open transmission systems. In addition, the communication board is SIL 4 certified.

Reduced maintenance costs

State-of-the-art communication technology, customised safety protocols and intelligent functionalities of the FAdC® have reduced the space occupation, energy consumption and overall maintenance costs for the Chengdu line.

Smart functions for maximised availability

Intelligent functionalities such as STS and CHC suppress error messages caused by accidental interferences and enable faulty track sections to be reset automatically, ensuring failsafe functioning, and further increasing the availability of the system.

Seamless integration into higher-level systems

The software interface has a modular and scalable design, delivering a high degree of flexibility in design and enabling the FAdC® to be easily configured and integrated into other systems.

Similar Projects
This might also interest you
1/5
train-detectionGermany

Dillinger Hütte | Germany

A new ladder track was required to provide more parking tracks in the steel plant. At the same time, the layout of the dead end tracks were optimised and the efficiency of the whole depot improved by installing the Frauscher Advanced Counter FAdC®i in combination with the wheel sensor RSR180. With the implementation of the Frauscher Diagnostic System FDS, the overall maintenance costs can be significantly reduced.
train-detectionPoland

Metro Warsaw | Poland

Metro Warsaw was looking for an alternative to track circuits for the line M2, to increase the availability of public transport by using reliable signalling technology. In the end, the operator even decided to replace the existing track circuits on line M1 with the Frauscher Axle Counter ACS200.
train-detectionIndia

Western Dedicated Freight Corridor (Rewari – Makarpura) | India

The Western Dedicated Freight Corridor (WDFC) represents one of the most strategically significant freight transportation projects in India. By facilitating the seamless transport of goods between major economic hubs, the intention is that the WDFC will significantly boost economic growth and development in the local region and beyond, further underlying the importance of this project.
train-detectionUnited States of America

Reducing Delays in a Metro (subway) Environment | USA

A large metro operator was researching ways to reduce bottlenecks that were causing significant delays at a busy station. With two routes dividing in close proximity to the station and a complex auto-routing system that required the use of a 30-second timer to release switches, trains would frequently back up when approaching the station.
train-detectionUnited Kingdom of Great Britain and Northern Ireland

Axle Counter Overlay System | UK

Between London St Pancras International Station and Farringdon Station, there is a history of frequent flooding through the tunnels that adversely affected the reliability of the existing train detection system. Due to this, the installation was non-operational during large periods. However, being a mainline section and a core route through London, high reciliation to any sort of failures is vital.