Jhansi - Bina Railway Line | India
train-detectionIndia

Jhansi - Bina Railway Line | India

Operator
Indian Railways – North Central Railway
Country
India
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
FAdC®, RSR180
Year
2017
Scope of project
221 counting heads, 148 track sections

The Jhansi-Bina railway line is a strategically important line which belongs to North Central Railway and is in Uttar Pradesh. Initially, the line featured analogue axle counters for detecting trains in individual track sections as well as a DC track circuit train detection system in less congested areas.

Eventually, there was a requirement to get them replaced with the Frauscher Advanced Counter FAdC®. This project is one of Frauscher’s iconic Indian Railway projects, featuring 221 counting heads and 148 track sections.

In this project, the FAdC® indoor electronics were placed in 19 stations and 15 block huts, and all 34 are connected over an Ethernet based redundant network, in a distributed architecture.

The wheel sensors were mounted onto the rail with the patented Frauscher Rail Claw which makes the installation process easy and convenient, since no drilling is required. In turn, this preserves the structural integrity of the rail, saves costs, and reduces the dwell time on track for the installation engineers. Additionally, the distributed architecture used in this project minimises setup costs and enhances scalability in an efficient and cost-effective way.

Increasing Availability

COM redundancy, PSC redundancy & network redundancy with bus architecture for very high availability.

Easy and Cost effective Integration

Greater cost saving due to distributed architecture and lower maintenance requirement.

Similar Projects
This might also interest you
1/5
train-detectionUnited Kingdom of Great Britain and Northern Ireland

Axle Counter Overlay System | UK

Between London St Pancras International Station and Farringdon Station, there is a history of frequent flooding through the tunnels that adversely affected the reliability of the existing train detection system. Due to this, the installation was non-operational during large periods. However, being a mainline section and a core route through London, high reciliation to any sort of failures is vital.
train-detectionCanada

Edmonton Metro Line | Canada

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.
train-detectionTaiwan

Shalun Signaling | Taiwan

The Shalun Line is frequented by four-car-trains and located in the south of Taiwan. Tropical conditions with temperatures between 22 and 28 degrees and high humidity are not the only challenge the Frauscher Axle Counter Solution has to deal with.
train-detectionCanada

Toronto Transit Commission | Canada

The Toronto Transit Commission (TTC) Line 1 Yonge-University is Toronto’s longest subway line, with track circuits utilized for signalling. Due to an increasing number of daily passengers and an aged system the need for upgrading without interfering with the daily operations became readily apparent. It was further required that the new signalling system functions independently of the existing system. It would provide CBTC fallback functionalities, and work as an overlay to the current track circuit-based system.
data-transmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project | United Kingdom

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.