Maintaining the past, creating the future | UK
train-detection

Maintaining the past, creating the future | UK

Operator
Dean Forest Railway
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
FAdC®, RSR123
Year
2019

The Dean Forest Railway (DFR) operates a historical 7 km passenger service line running north from Lydney Junction to Parkend, in the Forest of Dean. Due to extensions of the line and an additional turnout being added at Parkend, an update and modernisation of the existing train detection and signalling system was necessary. Being a heritage railway, it requires high standards in terms of signalling and safety, whilst maintaining the historical touch of the line.

The train detection system had to be integrated into the mechanical interlocking that was also being restored to bring Parkend signal box back to life. Achieving the necessary ballast resistance to reliably operate track circuits would have involved relaying a large portion of track. Together with the maintenance requirements of additional track circuits, this would have been too time-consuming, as the line is operated by a volunteer workforce. Alternatively, extending the original token system would have reduced the number of income-generating services. Thus, a different method of track vacancy detection was necessary.

Based on previous positive experiences, DFR decided to go for an axle counter solution from Frauscher. To provide maximum flexibility and meet the variety of requirements defined, the Frauscher Advanced Counter FAdC® was chosen. On track, nine Frauscher Wheel Sensors RSR123 are now detecting even the old steam train’s wheel flanges highly reliably. Using the system’s ability of establishing individual architectures, the axle counter was collocated with the interlocking inside the existing signal box. Track vacancy detection data is provided to be electronically integrated into the mechanical interlocking. Additionally, Supervisor Track Sections STS and Counting Head Control CHC are providing maximum availability and system resilience. The Frauscher Diagnostic System FDS provides DFR’s experts with remote access to real-time diagnostic data.

Quick installation

With the assistance of the Frauscher UK employees, installing and commissioning the FAdC® and Wheel Sensors RSR123 took only six days, including laying the cable. This resulted in a minimum downtime on site.

Reduction of ongoing maintenance costs

The possibility of remote diagnostics ensures that a time related benefit is given during operation as well, as it can help off duty staff members to support their colleagues onsite and reduce ongoing maintenance costs. Data configuration and consistency of spare parts, allows for future remodelling and expansion work.

Similar Projects
This might also interest you
1/5
train-detectionFrance

Extension Line D Tram Bordeaux | France

The Bordeaux tramway was the first French tram system equipped with a Frauscher axle counting system, benefitting from the innovative management methods like Counting Head Control.
train-detectionChina

Beijing Metro Line 12 | China

The Beijing Metro Line 12 is the first metro line that combines Frauscher Advanced Counter FAdC® and Railway Signal Safety Protocol Type I (RSSP-I). The line is currently under construction and expected to be put into operation at the end of 2024.
train-detectionSpain

Three-rail Castellbisbal | Spain

The dual-gauge system of the Spanish railway network is quite challenging in terms of track vacancy detection: Wheel sensors must be installed on two rails next to each other in tight spaces and have to detect axles reliably on the respective rail. Frauscher developed a solution which copes also with the complexity of different interlocking technology in the stations along the line.
train-detectionUnited States of America

Charlotte Area Transit System (CATS) Supplementing Audio Frequency Track Circuits with Axle Counters | USA

At the Charlotte Area Transit System, frequent false red signal overruns resulted when electromagnetic interference caused “bobbing” of the line’s audio frequency track circuits. The Frauscher Advanced Counter FAdC® was subsequently considered as an alternative to these track circuits to eliminate the occurrence of false red signal overruns.
train-detectionAustria

GKB Graz-Köflacher Bahn | Austria

The operator of the Graz-Köflacher Bahn has made substantial modernisations to the network, choosing a decentralised system architecture and the EULYNX standardised interface. In this case, it was crucial that the new system would ensure a seamless transition from the previous parallel interface for relay systems to EULYNX.