Axle Counter Overlay System | UK
train-detectionUnited Kingdom of Great Britain and Northern Ireland

Axle Counter Overlay System | UK

Operator
Network Rail
Country
United Kingdom of Great Britain and Northern Ireland
Partner
Siemens
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
FAdC®, RSR123
Year
2019
Scope of project
45 counting heads, 4 FAdC® location cases

Between London St Pancras International Station and Farringdon Station, there is a history of frequent flooding through the tunnels that adversely affected the reliability of the existing train detection system. Due to this, the installation was non-operational during large periods. However, being a mainline section and a core route through London, high reciliation to any sort of failures is vital.

In 2019, Network Rail started to look at how to improve the overall reliability of the railway without removing the existing detection system. The main requirement was guaranteeing maximum availability considering the local conditions without interfering with the existing installation.

Due to its great reliability under such circumstances the Frauscher Advanced Counter FAdC® has been chosen as the most appropriate solution. The FAdC’s® modular design allowed for the establishment of a decentralised architecture, where four external location cases were installed between the two stations to host the axle counter’s indoor equipment. The system is supported by the Frauscher Wheel Sensor RSR123, which precisely tracks every train axle. The sensor is extremely resilient to water penetration and other environmental and external influences. Thanks to the IP68 rated housing, it even works reliably in case of floods.

Excellent match of requirements

The FAdC® units installed in location cases between the stations can communicate with one another via a vital Ethernet interface and also with the higher-ranking system using relay outputs. With overlay systems, the new track sections had to match the existing track section limits. Therefore, the system had a specific requirement to install the RSR123 within 0.5 m of the existing train detection system and within proximity of the neutral section to avoid any impact on the signalling controls.

Great resilience

The RSR123 is highly resilient against any interference or environmental influences.

Similar Projects
This might also interest you
1/5
train-detectionUnited Kingdom of Great Britain and Northern Ireland

Churnet Valley Heritage Railway | UK

The Churnet Valley Heritage Railway preserves England's rich heritage of steam-powered rail transport.
train-detectionUnited States of America

Reducing Delays in a Metro (subway) Environment | USA

A large metro operator was researching ways to reduce bottlenecks that were causing significant delays at a busy station. With two routes dividing in close proximity to the station and a complex auto-routing system that required the use of a 30-second timer to release switches, trains would frequently back up when approaching the station.
train-detectionUnited States of America

Frauscher Track Vacancy System FTVS Testing | USA

During the initial development phase of the Frauscher Track Vacancy System FTVS, a number of pre-production units were released for real-world testing to examine their performance in typical yard environments. Consequently, several trials were conducted in the United States.
train-detectionGermany

Dillinger Hütte | Germany

A new ladder track was required to provide more parking tracks in the steel plant. At the same time, the layout of the dead end tracks were optimised and the efficiency of the whole depot improved by installing the Frauscher Advanced Counter FAdC®i in combination with the wheel sensor RSR180. With the implementation of the Frauscher Diagnostic System FDS, the overall maintenance costs can be significantly reduced.
train-detectionUnited Kingdom of Great Britain and Northern Ireland

London to Corby | UK

The project was part of Network Rail’s Midland Main line electrification programme and involved re-signalling between Bedford and Kettering. The goal is the reduction of industry costs and environmental benefits through lighter rolling stock, reduced fuel costs and lower carbon emissions.