Tram Huangpu Line 1 | China
train-detectionChina

Tram Huangpu Line 1 | China

Operator
Young Tram
Country
China
Partner
CRSC Xi’an
Segment
Urban
Application
Track Vacancy Detection
Products
RSR180, FAdC®
Protocols
Proprietary protocols
Year
2019

Tram Huangpu Line 1 (HP1) line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions can cause flooding of the track bed and add to the challenges for reliable system availability and operations. To provide safe and efficient wheel detection on this line, the Frauscher Advanced Counter FAdC®was installed and customised according to the Chinese Ministry of Railways Railway Safety Communication Protocol RSSP-1.

Tram Huangpu Line 1 (HP1) is the first tram line in Huangpu District of Guangzhou, which stretches 14,4 kilometers from Xiangxue Station to Xinfeng Station with a total of 20 stations and can support trams running at a maximum speed of 70 km/h.

The line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions in Guangzhou, including heavy rain, typhoons and high humidity levels, can subsequently cause flooding of the track bed which may affect operation.

To ensure smooth operation in harsh conditions like floods, the IP68 rated Wheel Sensor RSR180 was installed in combination with the Frauscher Advanced Counter FAdC®. As the FAdC® can be configured with a customised protocol, it was decided to implement the Railway Signal Safety Protocol RSSP-I protocol–Type I of RSSP, which is introduced as Chinese standard by China’s Ministry of Railways. In close collaboration of CRSC Xi’an Railway Signal Co., Ltd. (CRSC Xi’an) and CRSC Research & Design Institute Group Co., Ltd. (CRSCD) together with Frauscher, the RSSP-implemented FAdC® product was provided for the ­first time with an efficient and customised service. The COM-RSSP has been given the CENELEC SIL 4 certification in March 2021.

High availability

The RSR180 is not impacted by environmental conditions such as flooding, snow or severe temperatures.

Customised interface

The software interface of the FAdC® can be conf­igured with the Frauscher Safe Ethernet FSE protocol or other customised protocols. Both Chinese and Austrian Frauscher teams worked together closely with the customer to provide the RSSP-implemented FAdC® solution with an efficient and customised service.

Increasing system availability

The implementation of the Supervisor Track Section STS functions takes negative effects such as lightning into account, reducing the costs and times of maintenance. Moreover, the STS can be integrated into a modern efficient interlocking system so that the troubleshooting and component replacement can be carried out simultaneously, saving time for operators.

Similar Projects
This might also interest you
1/5
data-transmissionUnited Kingdom of Great Britain and Northern Ireland

Head Bolt Lane to Rainford Project | United Kingdom

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
train-detectionFrance

Homologation for the Île-de-France tramway network | France

The network of Île-de-France tramways in the region of Paris has been a showcase model of public transport since the line T1 opened in 1992. Over a million passengers use these trams daily and today, the system consists of 11 lines covering over 100 kilometres of track. Over the next years it is planned to expand this network even further. For track vacancy detection, the Frauscher axle counting system is considered as being the ideal solution for this comprehensive network.
train-detectionUnited States of America

Tracking Trains in Houston | USA

Houston MetroRail (METRO for short) is comprised of three light-rail lines covering 22 miles. Two-car, low-floor trainsets are powered by overhead catenary and operated on a mix of rail types, including embedded, grooved, concrete, and ballasted track. Harsh weather conditions such as extreme heat, humidity, and storms with heavy rains causing floods are typical for Houston. Combined with the variable track structure this caused significant malfunctions of the wheel sensors of METRO’s signalling system.
train-detectionUnited Kingdom of Great Britain and Northern Ireland

London to Corby | UK

The project was part of Network Rail’s Midland Main line electrification programme and involved re-signalling between Bedford and Kettering. The goal is the reduction of industry costs and environmental benefits through lighter rolling stock, reduced fuel costs and lower carbon emissions.
train-detectionIndia

Jhansi - Bina Railway Line | India

The Jhansi-Bina railway line is a strategically important line which belongs to North Central Railway and is in Uttar Pradesh. Initially, the line featured analogue axle counters for detecting trains in individual track sections as well as a DC track circuit train detection system in less congested areas.